Permit Status Glossary: What Each Status Actually Means
A permit tracker is only useful if everyone agrees what the labels mean. "In progress" can mean anything. These seven statuses are specific enough to act on and few enough to keep up to date.
1. Not Applied
The job is sold or planned, but no application has been submitted. Next step: gather what the application needs and submit it. A permit sitting here too long is a risk to the schedule.
2. Pending Review
The application is submitted and waiting for the jurisdiction. Next step: follow up if it has been longer than the office's normal turnaround. This is the status most likely to stall quietly.
3. Approved
The permit has been issued and work can proceed. Next step: schedule the work and book the first inspection when the stage is ready.
4. Inspection Scheduled
At least one inspection is booked. Next step: prepare for it and record the result as soon as you have it.
5. Passed
The required inspections are complete and signed off. Next step: file the sign-off with the job and close out the paperwork.
6. Failed
An inspection did not pass. Next step: capture the reason, correct it and rebook. Track any reinspection fee. See our failed-inspection workflow.
7. Expired
The permit has lapsed before the work was finished or signed off. Next step: contact the permitting office about renewal or extension options, since the rules vary.
Keep it honest
Update the status the moment something changes, and make that the field crew's job too, since they're the first to know. In PermitCrate, a quick-status control lets anyone on the team move a permit forward in two taps, even without signal.